Bexhill to Hastings Link Road (B2HLR)
Sector: Formwork, Reinforcement and Concrete (FRC)
Client: East Sussex Highways
Main Contractor: HOCHTIEF Taylor Woodrow JV
Project: Bexhill to Hastings Link Road (B2HLR)
Works: Greenways structures
TAG Construction Ltd were contracted to construct the greenway route bridge pilecaps, abutments and wingwalls. Works were carried out flood plains over rivers with associated safety and environmental hazards controlled. RC retaining walls were required between various structures to retain the backfill beneath the new road, including plinths and HD bolts for a new VRS. Culvert headwalls and wingwalls were constructed around precast culvert sections. TAG also provided the customer with skilled labour for various repairs and remediation to other concrete elements on the project.