Blackfriars – BT Baynards House

Sector: Formwork, Reinforcement & Concrete – Marine
Client: BAM Nuttall
Main Contractor:
Project: BT Maynards House
Works:

Baynards House (BT) for BAM Nuttall. Construction of a new water tight RC chamber around an existing tunnel carrying water cooling pipes. Construction of a sheet pile capping beam, precast flood protection cover slab and new inlet bellmouth surround. Working within a main cofferdam and a secondary cofferdam down through the Thames riverbed. Working generally from barges and within the cofferdam with manrider access only.