Chinese Gateway
Sector: Formwork, Reinforcement and Concrete (FRC)
Client: Westminster City Council
Main Contractor: FM Conway
Project: Chinese Gates, Wardour Street
Works: Greenway structures, retaining wall and culvert headwalls and wingwalls
TAG Construction Ltd were contracted to construct the new RC pilecaps and concrete encasement to the new Chinatown gateway steel structure. The pilecaps included a cast-in element of the lower portion of the steelwork. The concrete encasement included various features to the corners of the columns. TAG were responsible for all temporary works design and installation, including decks to support cross beams upto the top of the structure approximately 10m above street level. The works were completed on time in a challenging site on Wardour Street