Hammersmith Pumping Station – Thames Tideway (West)
Sector: Tunneling, Reinforcement & Concrete
Client: BAM, Morgan Sindall, Balfour Beatty
Project: Hammersmith Pumping Station
Construction of Interception Chamber (FRC)
Works at the Hammersmith Pumping Station were for the BAM Nuttall, Morgan Sindall Balfour Beatty joint venture delivering the west section of the Thames Tideway Tunnel Works include:
- Capping Beam
- Wailing beam
- Permanent and Temporary Props
- West Side Slab
- Wet Well Slab
- Liner Walls
- Internal walls
- Walkways vertical duct
- New Lintel Beams
Installing all rebar to above works and dowelling to Secant Piles and place blinding and permanent concrete.