Hammersmith Pumping Station – Thames Tideway (West)

Sector: Tunneling, Reinforcement & Concrete
Client: BAM, Morgan Sindall, Balfour Beatty
Project: Hammersmith Pumping Station

Construction of Interception Chamber (FRC)

Works at the Hammersmith Pumping Station were for the BAM Nuttall, Morgan Sindall Balfour Beatty joint venture delivering the west section of the Thames Tideway Tunnel Works include:

  • Capping Beam
  • Wailing beam
  • Permanent and Temporary Props
  • West Side Slab
  • Wet Well Slab
  • Liner Walls
  • Internal walls
  • Walkways vertical duct
  • New Lintel Beams

Installing all rebar to above works and dowelling to Secant Piles and place blinding and permanent concrete.

Bells & Mocketts Pumping Station

Sector: FRC
Client: Breheny Civil Engineering Ltd
Project: Bells and Mocketts Pumping Station

The project consisted of construction of a Spillway, Concrete Slabs, Walls, Capping Beams and Weed Dumping Slab. This consisted of pouring blinding and back blinding to walls and slabs. Fix Rebar to slabs, beams and walls. Then form formwork and temporary works to slabs. Finish with Concrete. Work was carried out to the programme and budget.

Blackfriars – BT Baynards House

Sector: Formwork, Reinforcement & Concrete – Marine
Client: BAM Nuttall
Main Contractor:
Project: BT Maynards House
Works:

Baynards House (BT) for BAM Nuttall. Construction of a new water tight RC chamber around an existing tunnel carrying water cooling pipes. Construction of a sheet pile capping beam, precast flood protection cover slab and new inlet bellmouth surround. Working within a main cofferdam and a secondary cofferdam down through the Thames riverbed. Working generally from barges and within the cofferdam with manrider access only.